PROJECT MANAGEMENT SKILLS (PMS) — MASTER CONCEPT & FORMULA SHEET

Complete Revision of All 5 Units • High-Yield Definitions • Formulas • Exam Traps & Memory Hacks

UNIT 1: Intro to Project Management

4 Marks
  • Project Definition: A temporary endeavor undertaken to create a unique product, service, or result. Has a definite start and finish.
  • Triple Constraints (Iron Triangle): Scope, Time, Cost. Quality sits in the center! Changing one constraint inevitably affects the others.
  • 5 Process Groups (Standard Life Cycle):
    1. Initiating  →  2. Planning  →  3. Executing  →  4. Monitoring & Controlling  →  5. Closing.

⚡ Project vs. Operation (Guaranteed DCET MCQ)

Project: Temporary, Unique output, Closed after goal is met (e.g., Constructing Metro line).
Operation: Ongoing, Repetitive, Sustains business (e.g., Running daily Metro trains).

RolePrimary Responsibility
Project ManagerOverall planning, execution, and closure; responsible for deliverables
Project SponsorProvides financial resources, business case & project charter
ConsultantOffers specialized technical/advisory expertise on specific tasks

UNIT 2: Project Administration & WBS

4 Marks
  • Work Breakdown Structure (WBS): Deliverable-oriented hierarchical decomposition of the total project scope.
  • The 100% Rule: WBS must capture 100% of all project work (internal & external) and NO unnecessary work.
  • Work Package: The lowest level of the WBS where cost, schedule, and resources can be reliably estimated.
  • Project Execution Plan (PEP): Primary document detailing HOW the project will be executed, monitored, and controlled.
  • Project Diary / Log: Daily record of events, decisions, resource utilization, and weather/site conditions.

⚡ WBS Memory Rule

Level 1: Total Project  →  Level 2: Major Deliverables  →  Lowest Level: Work Package.
DCET Trap: WBS does NOT show activity sequence or time dependencies — that's done by Network Diagrams!

  • Project Procedure Manual (PPM): Standard Operating Procedures (SOPs) for administrative policies, approvals, and quality standards.

UNIT 3: Project Life Cycle & Risk Management

4 Marks
  • 4 Core Phases:
    1. Initiation/Concept: Feasibility, Charter, Stakeholder identification.
    2. Planning: Scope, WBS, Schedule, Budget, Risk assessment.
    3. Execution/Implementation: Maximum resource & budget consumption!
    4. Closure/Termination: Handover, audit, releasing resources.
  • S-Curve: Cumulative cost/effort curve over time. Starts slow, accelerates during execution, levels off at closure.

⚡ Risk Matrix: Risk Score = Probability × Impact

Avoid: Change plan to eliminate threat entirely.
Mitigate (Reduce): Take actions to lower probability/impact (e.g., Backup generator).
Transfer: Shift financial impact to 3rd party (e.g., Insurance / Warranty).
Accept: Acknowledge risk when cost of mitigation exceeds potential impact.

Low Prob / High Imp
(Transfer / Insure)
High Prob / High Imp
(AVOID / MITIGATE)
Low Prob / Low Imp
(ACCEPT)

UNIT 4: Planning, Scheduling & Monitoring

4 Marks
  • Gantt Chart (by Henry Gantt): Horizontal bar chart showing tasks vs. timeline. Excellent for progress monitoring, but poorly depicts inter-task dependencies.
  • Milestone Chart: Depicts significant events/achievements.
    ⚠️ Critical Property: Duration = 0 (Zero Duration)! No resources consumed.
  • Resource Leveling vs. Resource Smoothing:
    • Leveling: Applied when resources are constrained. Can extend project finish date!
    • Smoothing: Adjusts activities within existing float. Project finish date does NOT change!
  • SMART Goals: Specific, Measurable, Achievable, Relevant, Time-bound.

⚡ Monitoring vs. Evaluation

Monitoring: Continuous, day-to-day tracking of inputs, activities & outputs.
Evaluation: Periodic assessment of overall relevance, effectiveness, and impact.

UNIT 5: Project Control, CPM, PERT, Crashing & Audit

4-5 Marks Guaranteed
Feature CPM (Critical Path Method) PERT (Program Evaluation & Review Technique)
Nature of Time Deterministic (Known with certainty) Probabilistic (Uncertain / Estimated with probability)
Time Estimates Single Time Estimate per activity Three Time Estimates: Optimistic (to), Most Likely (tm), Pessimistic (tp)
Orientation Activity-Oriented Event-Oriented
Typical Application Construction, Civil works, Repetitive projects R&D, Space missions, Defense, New drug development
Cost Focus High focus on Time-Cost tradeoff (Crashing) Primarily focused on Time estimation & control
PERT EXPECTED TIME (te)
te = (to + 4tm + tp) / 6
Weighted average based on Beta Distribution
PERT VARIANCE (σ²)
σ² = [ (tp − to) / 6 ]²
Standard Deviation σ = (tp − to) / 6
CRITICAL PATH RULE
Total Float = 0 (Slack = 0)
Longest sequence of activities in the network
  • Critical Path: The longest duration path from start to finish. Determines the minimum time required to complete the project. Any delay on this path delays the entire project!
  • Float / Slack: The amount of time an activity can be delayed without delaying the project. Activities on the Critical Path have ZERO float!
  • Project Crashing: Shortening project duration by adding resources (overtime, extra crew) at minimum extra cost.
    Golden Rule: Only crash CRITICAL activities with the lowest crash cost slope! Crashing non-critical activities wastes money.
  • Crash Cost Slope Formula:
    Cost Slope = (Crash Cost − Normal Cost) / (Normal Time − Crash Time)
  • Project Audit: Formal evaluation of project safety, financial integrity, methodology, and lessons learned.
    • Initial Review: Checks early feasibility & adherence.
    • Post-Audit / Closeout Review: Completed after handover to document what went right and wrong.
    • Abandonment Analysis: Evaluates whether stopping a failing project saves more capital than continuing it.
  • Modern Trends: Building Information Modeling (BIM), IoT sensors for real-time tracking, Cloud ERP dashboards.